Planning and Commissioning Wastewater Treatment Plants

File : pdf, 2.1 MB, 167 pages

TOC
Section 1 INTRODUCTION
1.1 Scope
1.2 Purpose
1.3 Commissioning Procedures

Section 2 FACILITIES PLANNING
2.1 Objectives
2.2 Requirements
2.3 Problem Definition and Probable Corrective Actions
2.4 Environmental Deficiencies Reporting
2.5 Funding

Section 3 PROGRAMMING
3.1 Prior Approval and Validation
3.2 Requirements and Management Plan (RAMP)
3.3 Engineering Studies
3.4 Future Air Force Requirements
3.5 Evaluation of Alternatives
3.6 Environmental Assessment (EA)/Environment Impact Statement (EIS) Initiation.
3.7 Support Documentation
3.8 Facility Requirements
3.9 Regulatory Agency Participation

Section 4 DESIGN
4.1 Design Initiation
4.2 Design Engineer Selection and Responsibilities.
4.3 Project Monitoring
4.4 References
4.5 Project Definition
4.6 Construction Documents
4.7 WWTP Performance Criteria
4.8 O&M Manuals
4.9 Operator Training Program
4.10 Permit Applications
4.11 Operator Participation During Design
4.12 Design Reliability and Maintainability (R&M).
4.13 Project Construction Cost Estimate
4.14 Regulatory Agency Review

Section 5 CONSTRUCTION
5.1 Construction Startup
5.2 Permits and Clearances
5.3 Title II Construction Services
5.4 Operator Involvement During Construction
5.5 Construction Schedule
5.6 As-Built Documentation and Record Drawings.

Section 6 INSPECTION COMMISSIONING
6.1 Startup Program
6.2 Inspections (Prefinal and Final)
6.3 Liability for Performance
6.4 Final Operating Permits
6.5 Dry and Wet Runs
6.6 Facility Walk-Through

Section 7 PERFORMANCE COMMISSIONING
7.1 Post-Startup Program
7.2 Training
7.3 WWTP Operation Performance Period
7.4 Performance Certification
7.5 SOPs
7.6 O&M Service Contract Documentation (Optional).